dummzeuch 1763 Posted September 28, 2022 (edited) Prompted by a post on Delphi Praxis, I just added a new feature to the Expert Manager expert in GExperts (lots of experts here 😉) : It can now change the order in which the experts are loaded into the IDE. read on in the blog post Edited September 28, 2022 by dummzeuch 1 Share this post Link to post